WAGO Invests at Sondershausen Site EUR 40 Million for New Central Warehouse

PBUS-38-WAGO-SondershausenFacility-400.jpg

April 14, 2022

WAGO founded its production facility in Sondershausen in 1990. Following the construction of the logistics center in 1999, it has since functioned as WAGO’s global shipping hub.

Now, WAGO’s ‘Gateway to the World’ in the Hainleite industrial park will see significant additional expansions. The supplier of interconnection and automation technology is investing 40 million euros in a modern high-bay warehouse, which clearly proclaims its support for the facility in Thuringia.

“This location already provides us with an optimal starting point for deliveries within Europe. Our national subsidiaries in 80 other countries are also supplied from Sondershausen,” explains Chief Operation Officer Yannick Weber, who emphasizes that, “it is especially important that we have a fantastic, energetic team, which is constantly expanding and developing. The expertise on site has achieved greater consideration in these times of digitization, and was a major criterion for our decision to invest more in Thuringia.”

Steffen Grimm, mayor of Sondershausen, is happy about the company’s plans, and ensured the employees about his full personal support for the intended expansion. “The establishment of the Sondershausen facility visibly ushered in a new chapter in WAGO’s history as a company. The construction of the new central warehouse will create new jobs and retain existing ones, yet it also serves as a sign that WAGO foresees a future here for the company, its employees, the region, and for Sondershausen and its people. I received the news that the decision had gone to Sondershausen with great joy and thanks, which I sure that I share with all of the citizens of Sondershausen. The city of Sondershausen stands fully united behind this project.”

WAGO will significantly expand its capacities with the new logistics center. A modern high-bay warehouse with the latest technology, a highly automated picking and storage area and office space for the site are being built on an area of 11,000 m² at the corner of Waldstraße and Am Bahndamm. A bridge will connect it to the existing logistics center.

In addition, as with all WAGO new construction projects, energy efficiency and resource conservation play an important role and aspects such as sustainable building and insulation materials and an efficient energy supply have been integrated into the planning since the start of the construction project.

The focus of the new building is greater digitization and automation of logistics – which will also ensure sustainable, future-proof development of the site. “Of course, this also applies to our production at the location. We likewise rely on the latest technologies here in order to be able to realize our growth in a balanced way and to remain competitive,” according to Weber. In order for this to succeed, there is also a need for qualified skilled workers and junior employees, which the company already seeks, primarily through trainees and apprentices.

Important_Links_Bar.jpg

https://www.wago.com/global/logistics-center

 

Related Articles

Network Infrastructure Featured Product Spotlight

PBUS 14 Panduit logo 400

This webinar presented by Beth Lessard and Keith Cordero will be highlighting three Panduit solutions that will optimize network equipment and cabling to ensure that your spaces are efficiently and properly managed to support ever-evolving business needs of today and beyond. Products that will be featured include PanZone TrueEdge Wall Mount Enclsoure, Cable Managers, and Adjustable Depth 4-Post Rack.

REGISTER HERE


Editor’s Pick: Featured Product News

Siemens: SIMOVAC Non-Arc-Resistant and SIMOVAC-AR Arc-Resistant Motor Controllers

The Siemens SIMOVAC medium-voltage non-arc-resistant and SIMOVAC-AR arc-resistant controllers have a modular design incorporating up to two 12SVC400 (400 A) controllers, housed in a freestanding sheet steel enclosure. Each controller is UL 347 class E2, equipped with three current-limiting fuses, a non-load-break isolating switch, and a fixed-mounted vacuum contactor (plug-in type optional for 12SVC400). The enclosure is designed for front access, allowing the equipment to be located with the rear of the equipment close to a non-combustible wall.

Read More


Sponsored Content
Electrify Your Enterprise

Power is vital to production, and well-designed control cabinets are key. Allied Electronics & Automation offers a comprehensive collection of control cabinet solutions including PLCs, HMIs, contactors, miniature circuit breakers, terminal block connectors, DIN-rail power supplies, pushbutton switches, motor starters, overloads, power relays, industrial Ethernet switches and AC drives engineered to keep your operations running safely, reliably and efficiently.

Learn more HERE.


Products for Panel Builders

  • SCHURTER: Green Line – Portfolio Expanded

    SCHURTER: Green Line – Portfolio Expanded

    SCHURTER significantly expands its portfolio of “Green Line” connectors. Because wherever you can reduce your CO₂ footprint without compromising on quality, you really should do so. As with the launch of the first series of Green Line products, SCHURTER remains true to its policy of offering a version with plant-based housings for products that are… Read More…

  • AutomationDirect: Teknokol Eco Series HMI Enclosures and Suspension Arm Systems

    AutomationDirect: Teknokol Eco Series HMI Enclosures and Suspension Arm Systems

    AutomationDirect has added Teknokol Eco series HMI enclosures and suspension arm systems which are designed to work together to provide customized, adjustable HMI panels using a selection of components and cut-to-length arm profiles. These suspension systems allow the HMI to be relocated as needed for better HMI visibility and operator comfort.  The medium-duty TK060 series… Read More…