Panel Builder US

April 13, 2020

By Matthew Masarik, Marketing Manager, Design Software, Rockwell Automation

It’s that moment you dread: You’re doing controls testing on a new machine as a customer’s start-up date approaches, when you discover a problem.

The issue could be almost anything. It could be a functionality problem, like an unexpected stoppage or a missing sensor. Or it could be a last-minute customer concern, like the HMI’s sequence or layout.

Whatever the issue, fixing it can be expensive. Some industrial companies, in fact, report that fixing a machine issue during commissioning can be up to 100 times more expensive than fixing it in the design phase. And of course, there’s also a risk that the issue will cause you to miss your customer’s production start date.

It’s for these reasons that some machine designers are adopting virtual commissioning. This process uses a digital model and simulation of your machine to perform controls testing before you even build a machine. This can help you identify design issues earlier in the build cycle and ultimately help you better meet customer deadlines.

Change What’s Possible

Virtual commissioning is made possible using software that creates a digital twin of your machine design and connects to the real operational logic of its control system. A dynamic digital twin is more than a 3D visual model. You can apply physics to your design and run it, so you can see how it operates and interacts with people or other machines.

You can do all this as soon as your machine design is complete, long before you cut steel or order parts. This can help you take controls testing off the critical path and avoid making changes at the 11th hour. Instead, when you arrive on site, your machine is ready for factory acceptance testing, and you’re not worrying about missing customer deadlines.

Some machine builders are discovering the tremendous savings that virtual commissioning can help them achieve.

One of them is Daifuku Webb, a maker of material handling systems. The company uses virtual commissioning to test PLC code in-house, before it goes to the field. In one project for an airport customer, Daifuku Webb used virtual controls testing to reduce the amount of time its engineers spent in the field from several months to about three weeks.

And the company sees other benefits from virtual commissioning beyond time savings.

System installations go more smoothly because the PLC code functions have already been tested. And the company is able to thoroughly demonstrate the functions of its systems before bringing them to the field.

Easy as 1, 2, 3

Creating a digital twin of your machine using simulation software is a straightforward process that involves three primary steps.

First, you bring in the machine’s CAD. Then, you mockup the machine’s movements and devices like sensors on the CAD. Finally, you connect the CAD to the controller and its tags. And with that, you have an open sandbox where you can begin testing out your machine and its logic digitally, long before you cut steel or order parts.

Important Links Bar.jpg

https://www.rockwellautomation.com/en_NA/news/blog/detail.page?pagetitle=Avoid-Costly-Surprises-With-Virtual-Commissioning-%7C-Blog&content_type=blog&docid=cf5ff6b88cee0a7641e1a00d3de58ec7

 

Editor's Pick: Featured Product News


 

RAFI has enhanced its RAFIX 30 FS+ illuminated pushbutton offering with the introduction of a stainless steel version. The sleek, modern design is available with optional LED ring lighting for stylish indication. Commonly used in automation, automotive, industrial and off-road vehicle applications, the RAFIX 30 FS+ illuminated pushbutton delivers clear and distinct tactile feedback, even through gloves.

Read More

 

Products for Panel Builders

  • Prev
Ideal for automotive, panel and control applications in a wide range of industries, the 12mm SFS ...
Fuji Electric Co., Ltd. (headquartered in Tokyo, Japan; led by President Michihiro Kitazawa) was ...
Yokogawa Electric Corporation announces that it has enhanced the Field Assistant software for the ...
The new monitor mounts GN 197, including VESA adapter plates and locking slide units GN 134.7 and ...
Bel Magnetic Solutions, a Bel group company, recently expanded the Vertical Mount MagJack ICM ...
The RAFIX 20 FS+ illuminated pushbutton switch is now available in stainless steel with ring ...
BittWare, a Molex company, recently unveiled the IA-840F, the company’s first Intel ...
Pepperl+Fuchs is expanding its factory automation portfolio and has acquired the USi ...
Schneider Electric recently announced the expansion of its IP and NEMA rated  ...
As part of the Digital Enterprise SPS Dialog, Siemens is launching Analyze MyDrives Edge, its first ...

Article Feature - Monthly Industry Focus


 

Fuji Electric Co., Ltd. (headquartered in Tokyo, Japan; led by President Michihiro Kitazawa) was recently pleased to announce that it has started mass production of its HPnC, outfitted with a 7th-generation X Series IGBT module, targeting the railway market.

Read More

News for Panel Builders

News for Panel Builders
  • Prev
Allied Electronics & Automation and Schneider Electric team up to help engineers build better ...
Even more exciting technology, even more valuable information, even more direct discussion – ...
Web-based Supervisory Control and Data Acquisition (SCADA) solutions deliver a new level of ...
B&R has made centralized, factory-level user management substantially easier. With the new ...
PC-based control technology from Beckhoff, which has already been used successfully for almost ...
Rockwell Automation, Inc. (NYSE: ROK) the world’s largest company dedicated to industrial ...
Everything from a single source, from the CCS charging inlet to a charging management solution: As ...
JM Electrical (JME) has recently announced the launch of a new division focused solely on ...
Emerson has recently been awarded a $14 million contract to provide automation technologies for the ...
Pepperl+Fuchs invites you to its second Online Summit. Register now free of ...

 

Condition monitoring of critical components on machines delivers enormous benefits to productivity in a plant.  Rather than have a motor, pump, or compressor unexpectedly fail and the machine be inoperable until a replacement part is installed, condition monitoring of those critical pieces on the machine can provide warning signs that something is about to go terribly wrong. Vibration measurements on rotating equipment can detect when there is imbalance or degrade on rolling bearing elements. 

Read More

 


 


 

Unplanned downtime threatens productivity and profit across industrial and commercial sectors. In a recent survey of these customers, 20% rate reaching zero unplanned downtime as their top priority, and 70% consider it a “very high priority.”

 Often, downtime comes as a surprise because facility operators lack visibility into their operations. Hardware failures and malfunctions account for 45% of downtime incidents – but 71% of field service decision makers aren’t fully aware of their assets’ maintenance schedule.

Read More

 

 

Those of you in the food industry are already familiar with the Food Safety Modernization Act (FSMA)—a law that focuses on preventing contamination, rather than reacting to the problem after the fact. A big part of FSMA compliance has to do with the design of plant equipment, which includes the electrical components that provide power to manufacturing lines.

Fortunately, MENNEKES offers a variety of electrical products that make FSMA compliance easier than ever. Let’s explore this topic in our new blog post.

 Read More